The Mars Orbiter Mission (MOM), also called Mangalyaan "Mars-craft" (Sanskrit मंगल maṅgala "Mars" + यान yāna "craft, vehicle")is a Mars orbiter launched into Earth orbit on 5 November 2013 by the Indian Space Research Organisation (ISRO).It was successfully inserted into Mars orbit on 24 September 2014, making India the first nation to do so on its first attempt.
The mission is a "technology demonstrator" project to develop the technologies for design, planning, management, and operations of an interplanetary mission. It carries five instruments, one of which, a methane detector, will particularly advance knowledge about Mars.
The Mars Orbiter Mission probe lifted-off from the First Launch Pad at Satish Dhawan Space Centre (Sriharikota Range [SHAR]), Andhra Pradesh, using a Polar Satellite Launch Vehicle (PSLV) rocket C25 at 09:08 UTC (14:38 IST) on 5 November 2013. The launch window was approximately 20 days long and started on 28 October 2013. The MOM probe spent about a month in Earth orbit, where it made a series of seven altitude-raising orbital manoeuvres before trans-Mars injection on 30 November 2013 (UTC).
The mission is a "technology demonstrator" project to develop the technologies for design, planning, management, and operations of an interplanetary mission. It carries five instruments, one of which, a methane detector, will particularly advance knowledge about Mars.
The Mars Orbiter Mission probe lifted-off from the First Launch Pad at Satish Dhawan Space Centre (Sriharikota Range [SHAR]), Andhra Pradesh, using a Polar Satellite Launch Vehicle (PSLV) rocket C25 at 09:08 UTC (14:38 IST) on 5 November 2013. The launch window was approximately 20 days long and started on 28 October 2013. The MOM probe spent about a month in Earth orbit, where it made a series of seven altitude-raising orbital manoeuvres before trans-Mars injection on 30 November 2013 (UTC).
First image taken by Mars Orbiter Mission of Mars' surface |
It is India's first interplanetary mission and ISRO has become the fourth space agency to reach Mars, after the Soviet space program, NASA, and the European Space Agency. The spacecraft is currently being monitored from the Spacecraft Control Centre at ISRO Telemetry, Tracking and Command Network (ISTRAC) in Bangalore with support from Indian Deep Space Network (IDSN) antennae at Byalalu.
The MOM mission concept began with a feasibility study in 2010, after the launch of lunar satellite Chandrayaan-1 in 2008. The government of India approved the project on 3 August 2012,after the Indian Space Research Organisation completed INR125 crore (US$21 million) of required studies for the orbiter The total project cost may be up to INR454 crore (US$74 million). The satellite costs INR153 crore (US$25 million) and the rest of the budget has been attributed to ground stations and relay upgrades that will be used for other ISRO projects.
The space agency had planned the launch on 28 October 2013 but was postponed to 5 November 2013 following the delay in ISRO's spacecraft tracking ships to take up pre-determined positions due to poor weather in the Pacific Ocean. Launch opportunities for a fuel-saving Hohmann transfer orbit occur every 26 months, in this case, 2016 and 2018. The Mars Orbiter's on-orbit mission life is six-to-ten months.
Assembly of the PSLV-XL launch vehicle, designated C25, started on 5 August 2013.The mounting of the five scientific instruments was completed at ISRO Satellite Centre, Bangalore, and the finished spacecraft was shipped to Sriharikota on 2 October 2013 for integration to the PSLV-XL launch vehicle. The satellite's development was fast-tracked and completed in a record 15 months. Despite the US federal government shutdown, NASA reaffirmed on 5 October 2013 it would provide communications and navigation support to the mission. ISRO chairman stated in November 2013 that if the MOM and NASA's orbiter MAVEN were successful, they would complement each other in findings and help understand Mars better.
The ISRO plans to send a follow-up mission with a greater scientific payload to Mars in the 2017–2020 timeframe; it would include an orbiter and a stationary lander.
Cost
The low cost of the mission was ascribed by Kopillil Radhakrishnan, the chairman of ISRO, to various factors, including a "modular approach", a small number of ground tests and long (18-20 hour) working days for scientists. BCC's Jonathan Amos mentioned lower worker costs, home-grown technologies, simpler design, and significantly less complicated payload than NASA's MAVEN. An opinion piece in The Hindu pointed out that the cost was equivalent to less than a single bus ride for each of India's population of 1.2 billion.
Objectives
The primary objective of the Mars Orbiter Mission is to showcase India's rocket launch systems, spacecraft-building and operations capabilities. Specifically, the primary objective is to develop the technologies required for design, planning, management and operations of an interplanetary mission, comprising the following major tasks:
design and realisation of a Mars orbiter with a capability to perform Earth-bound maneuvres, cruise phase of 300 days, Mars orbit insertion / capture, and on-orbit phase around Mars;
deep-space communication, navigation, mission planning and management;
incorporate autonomous features to handle contingency situations.
The secondary objective is to explore Mars' surface features, morphology, mineralogy and Martian atmosphere using indigenous scientific instruments.
The MOM mission concept began with a feasibility study in 2010, after the launch of lunar satellite Chandrayaan-1 in 2008. The government of India approved the project on 3 August 2012,after the Indian Space Research Organisation completed INR125 crore (US$21 million) of required studies for the orbiter The total project cost may be up to INR454 crore (US$74 million). The satellite costs INR153 crore (US$25 million) and the rest of the budget has been attributed to ground stations and relay upgrades that will be used for other ISRO projects.
The space agency had planned the launch on 28 October 2013 but was postponed to 5 November 2013 following the delay in ISRO's spacecraft tracking ships to take up pre-determined positions due to poor weather in the Pacific Ocean. Launch opportunities for a fuel-saving Hohmann transfer orbit occur every 26 months, in this case, 2016 and 2018. The Mars Orbiter's on-orbit mission life is six-to-ten months.
Assembly of the PSLV-XL launch vehicle, designated C25, started on 5 August 2013.The mounting of the five scientific instruments was completed at ISRO Satellite Centre, Bangalore, and the finished spacecraft was shipped to Sriharikota on 2 October 2013 for integration to the PSLV-XL launch vehicle. The satellite's development was fast-tracked and completed in a record 15 months. Despite the US federal government shutdown, NASA reaffirmed on 5 October 2013 it would provide communications and navigation support to the mission. ISRO chairman stated in November 2013 that if the MOM and NASA's orbiter MAVEN were successful, they would complement each other in findings and help understand Mars better.
The ISRO plans to send a follow-up mission with a greater scientific payload to Mars in the 2017–2020 timeframe; it would include an orbiter and a stationary lander.
Cost
The low cost of the mission was ascribed by Kopillil Radhakrishnan, the chairman of ISRO, to various factors, including a "modular approach", a small number of ground tests and long (18-20 hour) working days for scientists. BCC's Jonathan Amos mentioned lower worker costs, home-grown technologies, simpler design, and significantly less complicated payload than NASA's MAVEN. An opinion piece in The Hindu pointed out that the cost was equivalent to less than a single bus ride for each of India's population of 1.2 billion.
Objectives
The primary objective of the Mars Orbiter Mission is to showcase India's rocket launch systems, spacecraft-building and operations capabilities. Specifically, the primary objective is to develop the technologies required for design, planning, management and operations of an interplanetary mission, comprising the following major tasks:
design and realisation of a Mars orbiter with a capability to perform Earth-bound maneuvres, cruise phase of 300 days, Mars orbit insertion / capture, and on-orbit phase around Mars;
deep-space communication, navigation, mission planning and management;
incorporate autonomous features to handle contingency situations.
The secondary objective is to explore Mars' surface features, morphology, mineralogy and Martian atmosphere using indigenous scientific instruments.